2022 Furnace ('Phoenix') and Lehr at Quarley - Phoenix Firing Six (August 2022)
Projects: 2019 Onwards
 
Wood Gathering and Processing
 
Phoenix Firing Three
 
Repairs after Firing Three
 
Phoenix Firing Four
Phoenix Firing Five
 
The New Shelter Floor
 
The Electric Kiln
 
Rebuilding the Lehr
 
Etna Build and Firings
 
General Photos
Vesuvius Firepit Build
 
Vesuvius Superstructure Build
 
Vesuvius Firings
 
Repairs after Firing Five
 
Phoenix Firing Six                         
|   | 
| This was a seven-day firing, running from the 27th August to the 2nd September, 2022, and was devoted to glassblowing. We lit the furnace at around 07.15 and charged the pots between 08.45 and 09.30, when the furnace temperature reached 1000°C. We blew glass from about 10.00 until 13.00, broke for lunch, worked from 14.00 until about 19.00 (but with a tea break!), usually finishing at 19.30, after emptying the pots. This meant that total blowing time each day was about eight hours hours (except on the final day, when we stopped blowing at 17.30, and finished at 18.00). This was the first time that our electric kiln was used to keep the pots warm overnight. Our guest glassblower was Jeanne Goutheraud from France; here to gain experience of working at a wood-fired furnace. | 